Categories: Wire Stories

Pan American Silver Provides Mid-Year Exploration Update

VANCOUVER, British Columbia–(BUSINESS WIRE)–Pan American Silver Corp. (NYSE: PAAS) (TSX: PAAS) (“Pan American” or the “Company”) releases new drill results for its Jacobina, El Peñon, La Colorada and Huaron properties, reflecting the potential for continued mineral resource replacement at these assets. In particular, drill results from La Colorada and El Peñon reveal the significant exploration potential to find additional mineralized structures in under-explored ground surrounding these operations, highlighting the potential for mineral resource growth close to existing mine infrastructure.


“At La Colorada, we discovered an entirely new set of vein structures with high silver grades to the east and southeast of the main NC2 vein. At El Peñon, drill results from the Pampa Sur zone bode well for potential mineral resource additions close to the existing mine infrastructure, with additional potential in the largely unexplored southern area of the mine,” said Christopher Emerson, Pan American’s Vice President of Exploration and Geology.

Pan American’s exploration program focuses on near-mine exploration and mineral resource conversion throughout its portfolio. Since the last exploration update provided on December 5, 2023, a total of 223,157 metres have been drilled over the November 1, 2023 to April 30, 2024 period. The Company plans to drill an additional 200,000 metres from May 2024 to December 2024.

The drill results disclosed in this news release, together with the results from the second half of the 2023 drill program, will be integrated into the Company’s mineral reserves and mineral resources update as at June 30, 2024, which is expected to be released in August 2024. All intercepts are reported as estimated true widths in metres (“m”).

EXPLORATION HIGHLIGHTS

Jacobina mine, Brazil:

Jacobina is an underground paleo-placer gold mine located in the state of Bahia in northeastern Brazil. Mineralization is hosted by a series of steeply to moderately dipping quartz pebble conglomerate reefs, which range up to several metres in width. The mine complex extends over eight kilometres north/south, with mineral resources and exploration targets extending over a 14 kilometre trend. Mineralization remains open at depth and along strike in multiple areas.

  • Recent drilling at Jacobina totaled 30,426m, utilizing up to 13 surface and underground diamond drill rigs. The program included 18,847m of infill drilling to support conversion of inferred to indicated mineral resources at João Belo Sul, Morro do Vento, Serra do Córrego and Maricota zones. Exploration drilling totaling 7,930m was aimed at adding new mineral resources at the Maricota, João Belo Sul, João Belo Norte and Morro do Vento zones. In addition, 3,649m of exploration drilling tested new targets proximal to the mine area.
  • 7,088m of infill drilling at João Belo Sul confirms mineralization continuity, with drill hole JBS00062 returning 6.42m @ 2.37 g/t Au, including 2.72m @ 3.90 g/t Au and 6.23m @ 2.77 g/t Au, including 2.87m @ 4.12g/t Au.
  • At Morro do Vento, infill drilling confirms continuity and higher grades in the upper reefs in areas that had limited previous drilling. Hole MVTEX00195 returned 3.29m @ 15.40 g/t Au and 6.11m @ 2.48 g/t Au, including 2.10m @ 3.77 g/t Au. Hole MVTEX00191 included 8.14m @ 4.31 g/t Au, including 2.22m @ 6.38 g/t Au. A portion of the lower conglomerate zone was successfully converted to indicated mineral resources with infill hole MVTEX00193 returning 6.76m @ 3.91 g/t Au and 2.48m @ 4.53 g/t Au and MVTEX00198, with 7.02m @ 2.35 g/t Au, including 2.64m @ 4.24 g/t Au.
  • Exploration and infill drilling at Maricota also confirmed grade continuity. Drill highlights include holes MRCEX0019, with 8.45m @ 2.22 g/t Au, including 4.84m @ 3.05 g/t Au, MRCEX0016 with 2.56m @ 4.04 g/t Au (LVLPC reef) and 1.19m @ 56.48 g/t Au (HW reef), and infill hole MRCEX00020, with 2.88m @ 5.88 g/t Au. The Maricota zone remains open at depth and along strike to the north.
  • Infill drill results at Serra do Córrego confirm higher grades characteristic of this sector. Highlights include drill hole SCOEX00017 with 11.59m @ 3.37 g/t Au (including 4.17m @ 4.90 g/t Au and 2.83m @ 4.17 g/t Au), and 14.00m @ 5.55 g/t Au (including 3.30m @ 15.92 g/t Au and 2.47m @ 6.07 g/t Au).

El Peñon, Chile:

El Peñon is a high-grade low-sulphidation epithermal vein Au-Ag deposit, located at an average elevation of 1,800 m above sea level within the Paleocene mineral belt of northern Chile. The deposit consists of a series of steeply to moderately dipping, north-south striking quartz veins, which extend within a 14 kilometre long northeast trending corridor. The 122,000 ha property hosts several satellite deposits and targets, which are actively being explored.

  • Recent drilling totaled 44,645m (20,538 m infill drilling and 24,107m exploration) with up to 14 drill rigs. Infill drilling focused on conversion of inferred to indicated mineral resources in several main structures (El Valle, Pampa Campamento and Martillo Flats SSE veins) and at the Chiquilla Chica and Tostado Sur zones, located 20 kilometres and eight kilometres southwest of the core mine area, respectively.
  • Continued positive infill and exploration drilling at the central El Valle vein and northern extension of the Pampa Campamento vein. Highlights at Pampa Campamento include UIP0163, with 0.95m @ 11.0 g /t Au and 258 g/t Ag and 1.80m @ 12.2 g/t Au and 182 g/t Ag, and UIP0155, with 0.72m @ 21.5 g/t Au and 748 g/t Ag and UEP0060 returned 0.76m @ 7.6 g/t Au and 207 g/t Ag. Infill drilling at El Valle confirms high grade structures with SIV0007 returning 1.33m @ 13.1 g/t Au and 403 g/t Ag, and 0.61m @ 28.5 g/t Au and 204 g/t Ag, UIV0076 with 1.67m @ 11.7 g/t Au and 449 g/t Ag and hole SEV0009 intersected 1.11m @ 12.0 g/t Au and 356 g/t Ag.
  • Initial exploration drilling at the newly discovered Pampa Sur vein, south of the core mine area, returned positive results in hole SEP0050, with 0.80m @ 15.6 g/t Au and 94 g/t Ag, and hole SEP0032 with 1.22m @ 22.2 g/t Au and 1,005 g/t Ag. Pampa Sur represents an excellent opportunity to add new mineral resources close to existing mine infrastructure.
  • High-grade silver results have been confirmed in infill drilling at Tostado Sur zone with 1.03m @ 7,574 g/t Ag and 0.1 g/t Au (drill hole SIH0015), 1.02m @ 3,802 g/t Ag (SIH0014) and 7.50m @ 1,217 g/t Ag and 0.1 g/t Au (SIH0016).

La Colorada mine, Mexico:

The La Colorada mine is a silver-rich polymetallic vein mine located in the state of Zacatecas, Mexico. The deposit is an intermediate sulphidation epithermal vein system, with associated splays. Individual veins are typically one to two metres wide with strike lengths of between 900 metres and 1.5 kilometres.

  • A total of 75 holes for 15,705m of infill drilling was completed, focusing on the vein targets (NC2, Mariana, Intermedia, Veta 3, SE system, and Liz) from both surface and underground. 15 surface exploration holes successfully extended the NC2 vein to the east and intercepted two new structures (Mariana and Intermedia).
  • Results from drilling on the east extension of the NC2 vein returned high-grade silver intercepts. Drill highlights include: S-108-23 with 1.42m @ 1,131 g/t Ag, 3.05% Pb, 5.50% Zn (NC2 vein) and 0.85m @ 760 g/t Ag, 0.48% Pb, 0.86% Zn (Mariana vein) and S-27-24, with 1.04m @ 5,991 g/t Ag, 4.06% Pb, 8.74% Zn (NC2 vein), 0.59m @ 2,291 g/t Ag, 3.27% Pb, 6.08% Zn (Intermedia East vein) and 2.51m @ 426 g/t Ag, 1.22% Pb, 3.63% Zn (Mariana vein).
  • S-05-24 drill hole, planned as part of the La Colorada Skarn infill program, intercepted several structures in the San Geronimo vein system south of the NC2 Vein. Drill hole S-05-24 intersected a new vein with 1.41m @ 825 g/t Ag, 4.48% Pb, 9.26% Zn, a splay vein with 1.95m @ 1,755 g/t Ag, 2.69% Pb, 5.78% Zn and a second structure with 2.16m @ 1,190 g/t Ag, 1.19% Pb, 2.22% Zn. This drill hole confirms additional structures at the San Geronimo vein system in addition to the three already known veins covering an area of 400m along strike and 600m vertical.
  • A new vein system parallel to the NC2 vein was discovered in the SE area of the mine based on the drilling of S-20-24 and S-71-24. S-20-24 intersected the Cristina vein with 5.67m @ 614 g/t Ag, 2.10% Pb and 5.95% Zn and new splay veins with 0.36m @ 2,336 g/t Ag, 2.24% Pb, 4.52% Zn, 1.12m @ 1,212 g/t Ag, 2.32% Pb, 2.59% Zn and 0.65m @ 1,551 g/t Ag, 5.28% Pb and 7.93% Zn. S-71-24 intersected the Cristina vein with 1.89m @ 3,342 g/t Ag, 0.96 g/t Au, 4.62% Pb and 4.67% Zn and a second vein with 29.51m @ 128 g/t Ag, 0.85 g/t Au, 2.28% Pb and 5.80% Zn.

Huaron mine, Peru:

The Huaron mine, situated in the western cordillera of the Andes within the Cerro de Pasco Department of central Peru, is a polymetallic deposit featuring zinc, lead, silver, and copper. The deposit is defined by hydrothermal veins and replacement bodies hosted in folded and faulted sedimentary rocks.

  • A total of 78 holes for 18,419m were drilled, focused on brownfield extensions to define new inferred mineral resources along principal structures in the mid and lower portion of the mine area as well as the Horizonte zone. The Horizonte zone is an emerging multiple vein system southwest of the core mine area. Development along these veins continues to define mineral resources in this area.
  • High-grade mineralization on the Patrick vein was extended by 200m and remains open at depth. Results include DDH-U-041-24 with 1.66m @ 819 g/t Ag, 11.53% Pb and 14.48% Zn and hole DDH-U-047-24 with 5.46m @ 331 g/t Ag, 1.32% Pb and 3.58% Zn.
  • The east extension on the Cometa Ramal vein was confirmed with DDH-U-049-24 with 2.32m @ 627 g/t Ag, 3.36% Pb and 17.77% Zn, hole DDH-U-018-24 with 4.0 m @ 333 g/t Ag, 5.50% Pb and 20.44% Zn and DDH-U-085-23 with 1.50m @ 528 g/t Ag, 4.01% Pb and 7.47% Zn.
  • Drilling on the Labor Este vein confirmed a 300 metre extension along strike and 100 metres down dip. New results include hole DDH-U-027-24 with 1.68m @ 332 g/t Ag, 6.77% Pb and 6.78% Zn.

DRILL RESULT HIGHLIGHT TABLES

Jacobina, Brazil

The following table provides infill and exploration drill result highlights for the Jacobina mine. Full infill and exploration drill results not included in this table, together with cross sections and plans, are available at https://panamericansilver.com/operations/exploration/.

Hole No.

Sector

Incl.

From (m)

To (m)

Interval (m)

Est. True Width (m)

Au g/t

JBS00054

João Belo Sul

 

247.08

251.50

4.42

2.65

2 .61

JBS00054

João Belo Sul

 

258.00

265.00

7.00

4.20

2.28

JBS00056

João Belo Sul

 

440.32

447.00

6.68

5.95

2.24

JBS00056

João Belo Sul

Incl

440.32

444.00

3.68

3.28

3.45

JBS00062

João Belo Sul

 

190.00

196.84

6.84

6.42

2.37

JBS00062

João Belo Sul

Incl

190.00

192.90

2.90

2.72

3.90

JBS00062

João Belo Sul

 

331.00

337.50

6.50

6.23

2.77

JBS00062

João Belo Sul

Incl

334.50

337.50

3.00

2.87

4.12

JBS00082

João Belo Sul

 

429.89

433.94

4.05

3.20

6.58

JBEX00118

João Belo Norte

 

442.50

446.21

3.71

2.07

2.58

JBEX00121

João Belo Norte

 

55.50

60.00

4.50

3.34

2.14

MRCEX00012

Maricota

 

772.00

777.88

5.88

5.78

2.52

MRCEX00012

Maricota

Incl

774.00

777.04

3.04

2.98

3.07

MRCEX00012

Maricota

 

777.88

780.63

2.75

2.70

4.18

MRCEX00016

Maricota

 

72.50

75.50

3.00

2.56

4.04

MRCEX00016

Maricota

 

411.72

413.00

1.28

1.19

56.48

MRCEX00018

Maricota

 

229.00

230.50

1.50

1.37

7.86

MRCEX00019

Maricota

 

421.74

430.50

8.76

8.45

2.22

MRCEX00019

Maricota

Incl

421.74

426.76

5.02

4.84

3.05

MRCEX00020

Maricota

 

279.96

283.50

3.54

2.88

5.88

MRCEX00023

Maricota

 

496.00

504.00

8.00

4.39

2.21

SCOEX00017

Serra do Córrego Norte

 

325.80

341.00

15.20

11.59

3.37

SCOEX00017

Serra do Córrego Norte

Incl

325.80

331.26

5.46

4.17

4.90

SCOEX00017

Serra do Córrego Norte

Incl

333.13

336.85

3.72

2.83

4.17

SCOEX00017

Serra do Córrego Norte

 

345.00

362.00

17.00

14.00

5.55

SCOEX00017

Serra do Córrego Norte

Incl

345.50

349.50

4.00

3.30

15.92

SCOEX00017

Serra do Córrego Norte

Incl

356.50

359.50

3.00

2.47

6.07

SCOEX00018

Serra do Córrego Norte

 

418.00

421.50

3.50

1.96

11.28

MVTEX00191

Morro do Vento Norte

 

282.00

293.00

11.00

8.14

4.31

MVTEX00191

Morro do Vento Norte

Incl

282.00

285.00

3.00

2.22

6.38

MVTEX00195

Morro do Vento Norte

 

63.97

67.50

3.53

3.29

15.40

MVTEX00195

Morro do Vento Norte

 

168.61

175.00

6.39

6.11

2.48

MVTEX00195

Morro do Vento Norte

Incl

168.61

170.81

2.20

2.10

3.77

MVTEX00193

Morro do Vento Sul

 

167.00

173.93

6.93

6.76

3.91

MVTEX00193

Morro do Vento Sul

 

182.80

185.34

2.54

2.48

4.53

MVTEX00198

Morro do Vento Sul

 

215.40

224.50

9.10

7.02

2.35

MVTEX00198

Morro do Vento Sul

Incl

216.50

219.92

3.42

2.64

4.24

MVTEX00198

Morro do Vento Sul

 

240.00

243.00

3.00

2.34

3.31

MVTEX00209

Morro do Vento Sul

 

176.00

187.08

11.08

8.19

3.12

MVTEX00209

Morro do Vento Sul

Incl

176.00

180.00

4.00

2.95

4.03

MVTEX00209

Morro do Vento Sul

Incl

183.84

187.08

3.24

2.39

5.11

CANEX00145

Canavieiras Central

 

122.00

131.00

9.00

6.67

6.78

CANEX00147A

Canavieiras Central

 

115.50

117.00

1.50

1.22

8.93

El Peñon, Chile

The following table provides infill and exploration drill result highlights for the El Peñon mine. Full infill and exploration drill results not included in this table, together with longitudinal sections and plans, are available at https://panamericansilver.com/operations/exploration/.

Hole

Vein

From (m)

To (m)

Interval (m)

Est. True Width (m)

Au (g/t)

Ag (g/t)

SEX0022

Bermuda

461.00

463.00

2.00

1.02

6.50

137

SIH0001

Chiquilla Chica

238.05

239.00

0.95

0.65

1.40

751

SIH0002

Chiquilla Chica (-30)

157.00

162.00

5.00

3.19

0.20

415

SIH0002

Chiquilla Chica

247.55

248.75

1.20

0.80

0.20

487

SIH0003

Chiquilla Chica

226.38

228.09

1.71

1.49

0.60

688

SIH0004

Chiquilla Chica

226.35

228.75

2.40

1.36

0.20

477

UEV0036

El Valle

246.85

248.70

1.85

1.24

5.40

236

SIV0002

El Valle

285.00

286.60

1.60

1.35

9.60

120

SIV0005

El Valle

327.30

329.80

2.50

1.43

7.10

185

UIV0061

El Valle

196.00

198.00

2.00

1.63

9.50

473

UIV0063

El Valle

193.00

194.45

1.45

0.86

11.40

391

SIV0006

El Valle

410.00

413.00

3.00

0.90

9.10

525

SEV0009

El Valle

282.00

283.39

1.39

1.11

12.00

356

SIV0007

El Valle (-20)

228.37

229.20

0.83

0.61

28.50

204

SIV0007

El Valle

273.60

275.40

1.80

1.33

13.10

403

SIV0003

El Valle

243.60

244.40

0.80

0.57

9.60

90

UIV0066

El Valle

225.45

227.92

2.47

1.28

4.70

288

UIV0065

El Valle

163.65

165.50

1.85

1.14

6.00

241

UIV0069

El Valle

169.09

169.76

0.67

0.78

7.10

129

UIV0076

El Valle

208.00

210.50

2.50

1.67

11.70

449

UIV0067

El Valle (-9)

169.50

172.00

2.50

1.52

8.2

107

UIV0058

El Valle FW

254.00

256.35

2.35

1.01

3.6

174

SIM0022

Martillo Flat SSE

202.55

203.70

1.15

0.63

68.2

880

SIM0025

Martillo Flat SSE

241.70

242.40

0.70

0.47

12.0

485

UIP0153

Pampa Campamento

252.50

254.00

1.50

1.16

5.0

144

UIP0155

Pampa Campamento

127.40

128.70

1.30

0.72

21.5

748

UEP0060

Pampa Campamento

242.58

243.55

0.97

0.76

7.6

207

UEP0061

Pampa Campamento

340.60

341.13

0.53

0.45

12.5

287

UIP0158

Pampa Campamento

236.60

237.39

0.79

0.68

26.8

62

UIP0163

Pampa Campamento

268.40

269.75

1.35

0.95

11.0

258

UIP0163

Pampa Campamento (+8)

282.05

284.07

2.02

1.80

12.2

182

UIP0164

Pampa Campamento (-4)

263.80

264.45

0.65

0.60

8.4

133

UIP0164

Pampa Campamento

267.12

268.20

1.08

0.86

11.5

202

UIP0164

Pampa Campamento (+2)

269.50

270.50

1.00

0.80

6.9

163

SEP0050

Pampa Sur

405.92

406.96

1.04

0.80

15.6

94

SEP0032

Pampa Sur (+4)

429.60

430.13

0.53

0.48

9.1

385

SEP0032

Pampa Sur

436.18

437.60

1.42

1.22

22.2

1005

SEP0035

Pampa Sur

365.00

366.00

1.00

0.62

10.9

266

SEP0037

Pampa Sur

467.40

468.50

1.10

0.88

13.2

781

SEP0057

Pampa Sur

333.30

334.40

1.10

0.70

6.6

442

SIP0050

Pampa Sur

439.45

440.45

1.00

0.62

4.6

261

SIS0017

Sorpresa Sur

467.70

469.10

1.40

0.80

11.5

853

SIH0014

Tostado Sur

7.75

8.75

1.00

0.96

0.0

3530

SIH0014

Tostado Sur

9.80

10.90

1.10

1.02

0.0

3802

SIH0014

Tostado Sur

14.00

14.70

0.70

0.62

0.1

2347

SIH0015

Tostado Sur

7.90

9.05

1.15

1.03

0.1

7574

SIH0016

Tostado Sur

0.80

10.85

10.05

7.50

0.1

1217

La Colorada, Mexico

The following table provides the drill result highlights for the La Colorada mine. Full drill results not included in this table, together with cross sections and plans, are available at https://panamericansilver.com/operations/exploration/.

Hole No.

Vein

From (m)

To (m)

Interval (m)

Est. True Width (m)

Ag g/t

Au (g/t)

Pb %

Zn %

S-108-23

Mariana

502.55

503.85

1.30

0.85

760

0.08

0.48

0.86

And

NC2

624.90

628.50

3.60

1.42

1131

0.95

3.05

5.50

S-119-23

Mariana

592.60

594.15

1.55

0.89

499

0.13

0.16

0.42

And

Intermedia Este

604.25

607.00

2.75

1.17

78

0.08

0.38

1.50

And

NC2

659.65

660.00

0.35

0.14

247

0.19

0.66

2.51

S-125-23

Mariana

525.80

527.85

2.05

1.31

689

0.07

0.35

1.45

S-131-23

Mariana

510.80

513.35

2.55

1.69

551

0.11

0.60

0.80

And

NC2

578.90

580.50

1.60

0.61

103

0.14

0.24

0.73

S-134-23

NC2

758.80

760.05

1.25

0.75

214

0.14

3.71

10.98

S-139-23

Mariana

522.70

523.40

0.70

0.45

2639

0.27

1.86

4.56

And

NC2

600.85

602.10

1.25

0.36

647

0.33

1.23

4.68

S-27-24

Mariana

620.30

623.65

3.35

2.51

426

0.14

1.22

3.63

And

Intermedia Este

627.00

627.95

0.95

0.59

2291

0.40

3.27

6.08

And

NC2

669.35

671.55

2.20

1.04

5991

1.79

4.06

8.74

S-39-24

Mariana

648.95

650.35

1.40

1.02

499

0.14

0.55

1.38

And

Intermedia Este

697.40

698.95

1.55

0.92

912

0.73

2.70

7.98

And

NC2

721.30

723.75

2.45

1.22

136

0.10

1.00

1.54

S-51-24

Mariana

581.25

581.70

0.45

0.36

1901

0.07

1.09

3.35

And

Intermedia Este

598.50

599.20

0.70

0.61

2776

0.27

1.52

0.90

And

NC2

648.30

648.80

0.50

0.41

909

1.00

1.68

7.56

S-97-23

NC2

630.70

631.70

1.00

0.84

205

0.07

0.32

0.63

S-20-24

Cristina Vein System

494.45

497.10

2.65

1.64

950

0.38

2.12

3.48

And

Cristina Vein System

523.30

525.15

1.85

1.12

1212

0.11

2.32

2.59

And

Cristina Vein System

532.20

532.65

0.45

0.36

2336

0.37

2.24

4.52

And

Cristina Vein System

553.55

555.20

1.65

0.65

1551

0.44

5.28

7.93

And

Cristina Vein System

567.45

576.60

9.15

5.67

614

0.30

2.10

5.95

S-05-24

San Geronimo Vein System

494.40

495.65

1.25

0.77

951

0.30

0.65

1.67

And

San Geronimo Vein System

570.20

571.70

1.50

1.41

825

2.67

4.48

9.26

And

San Geronimo Vein System

574.10

576.40

2.30

1.95

1755

1.11

2.69

5.78

And

San Geronimo Vein System

637.40

640.35

2.95

2.16

1190

0.66

1.19

2.22

And

San Geronimo Vein System

738.45

739.55

1.10

0.84

317

0.16

3.77

3.64

And

San Geronimo Vein System

941.90

943.20

1.30

0.44

284

0.14

7.17

7.55

S-71-24

Cristina Vein System

367.45

370.15

2.70

1.89

3342

0.96

4.62

4.67

And

Cristina Vein System

373.45

375.05

1.60

1.12

161

0.27

2.67

3.42

And

Cristina Vein System

386.10

386.35

0.25

0.18

196

0.10

0.82

0.52

And

San Geronimo Vein System

422.80

423.00

0.20

0.14

172

0.08

0.28

1.21

And

San Geronimo Vein System

460.50

460.85

0.35

0.25

254

0.18

0.47

1.55

And

San Geronimo Vein System

508.40

509.15

0.75

0.53

471

0.68

0.67

2.14

And

San Geronimo Vein System

528.15

528.65

0.50

0.35

70

0.29

5.30

10.41

And

San Geronimo Vein System

552.40

554.30

1.90

1.33

149

0.22

2.53

2.27

And

San Geronimo Vein System

584.60

626.76

42.15

29.51

128

0.85

2.28

5.80

Huaron, Peru

The following table provides infill and exploration drill result highlights from the medium, lower and Horizonte sectors of the Huaron mine. Full drill and channel sampling results not included in this table, together with cross sections and plans, are available at https://panamericansilver.com/operations/exploration/.

Hole No

Vein

Zone

From (m)

To (m)

Interval (m)

Est. True Width (m)

Ag g/t

Cu%

Pb%

Zn%

DDH-U-007-24

Cometa Ramal

Horizonte

357.15

358.40

1.25

0.99

289

0.13

4.74

5.82

DDH-U-018-24

Cometa Ramal

Horizonte

431.55

440.20

8.65

4.00

333

0.49

5.50

20.44

DDH-U-026-24

Cometa Ramal

Horizonte

362.30

363.65

0.70

0.97

33

0.02

0.33

0.33

DDH-U-037-24

Cometa Ramal

Horizonte

370.95

373.05

2.10

1.52

81

0.10

1.31

2.21

DDH-U-043-24

Cometa Ramal

Horizonte

406.65

408.90

2.25

1.50

250

0.22

3.67

6.43

DDH-U-049-24

Cometa Ramal

Horizonte

435.45

438.85

3.40

2.32

627

0.79

3.36

17.77

DDH-U-052-24

Cometa Ramal

Horizonte

301.40

302.25

0.85

0.70

28

0.02

0.28

0.54

DDH-U-057-24

Cometa Ramal

Horizonte

385.70

387.95

2.05

1.50

282

0.40

3.20

8.84

DDH-U-085-23

Cometa Ramal

Horizonte

430.70

435.35

4.65

1.50

528

0.33

4.01

7.47

DDH-U-091-23

Cometa Ramal

Horizonte

346.55

348.70

2.15

1.64

272

0.08

3.32

2.00

DDH-U-096-23

Cometa Ramal

Horizonte

397.00

402.05

5.05

3.64

85

0.05

1.43

3.51

DDH-U-047-24

Patrick

Middle

188.50

196.80

8.30

5.46

331

0.20

1.32

3.58

DDH-U-035-24

Patrick

Middle

136.80

142.80

6.00

5.92

234

0.13

1.04

4.12

DDH-U-041-24

Patrick

Middle

140.70

142.45

1.75

1.66

819

0.35

11.53

14.48

DDH-U-039-24

Patrick

Middle

180.30

182.05

1.75

1.71

337

0.23

1.50

2.10

DDH-U-045-24

Patrick

Middle

157.85

161.35

3.50

3.06

179

0.08

3.39

5.37

DDH-U-055-24

Patrick

Middle

140.70

143.30

2.60

2.52

107

0.03

1.84

5.49

DDH-U-051-24

Patrick

Middle

184.70

186.70

2.00

1.55

156

0.03

1.20

3.06

DDH-U-033-24

Labor Este

Horizonte

158.40

162.60

4.20

3.87

147

0.03

3.19

3.86

DDH-U-027-24

Labor Este

Horizonte

227.10

229.35

2.25

1.68

332

0.03

6.77

6.78

DDH-U-036-24

Labor Este

Horizonte

216.15

220.05

3.90

2.65

126

0.03

1.66

1.12

DDH-U-048-24

Labor Este

Horizonte

190.90

192.90

2.00

0.96

266

0.08

5.47

14.94

DDH-U-020-24

Labor Este

Horizonte

214.00

215.75

1.75

1.09

205

0.05

6.19

3.82

DDH-U-040-24

Labor Este

Horizonte

184.10

186.55

2.45

1.70

123

0.06

3.06

5.98

DDH-U-016-24

Labor Este

Horizonte

254.60

255.05

0.45

0.18

627

0.11

9.44

3.39

DDH-U-003-24

Labor Este

Horizonte

259.70

260.80

1.10

0.66

144

0.06

3.92

4.60

DDH-U-030-24

Labor Este

Horizonte

190.95

192.65

1.70

1.40

47

0.03

1.65

1.43

DDH-U-044-24

Labor Este

Horizonte

237.80

238.20

0.40

0.20

288

0.10

2.75

4.29

DDH-U-009-24

Labor Este

Horizonte

230.00

230.35

0.35

0.23

181

0.16

7.52

9.01

DDH-U-052-24

Labor Este

Horizonte

179.15

181.50

2.35

1.26

32

0.02

0.53

0.38

DDH-U-016-24

Cuerpo Andres

Horizonte

75.30

77.00

1.70

1.49

233

0.14

3.59

6.92

DDH-U-020-24

Cuerpo Andres

Horizonte

69.40

71.25

1.85

1.78

194

0.03

3.11

8.58

DDH-U-056-24

Cuerpo Andres

Horizonte

48.35

53.00

4.65

3.90

162

0.04

4.02

6.06

DDH-U-060-24

Cuerpo Andres

Horizonte

85.00

87.85

2.85

1.45

231

0.08

2.44

4.38

DDH-U-061-24

Cuerpo Andres

Horizonte

48.45

49.75

1.30

1.06

241

0.08

4.19

8.75

DDH-U-062-24

Cuerpo Andres

Horizonte

81.50

83.20

1.70

0.86

756

0.22

8.28

9.61

General Notes with Respect to Technical Information

Grades are shown as contained metal before mill recoveries are applied. The Company has undertaken a verification process with respect to the data disclosed in this news release.

Samples are analyzed at a variety of laboratories, including by in-house staff at the mine (Jacobina and La Colorada), mine laboratories operated by third party independent commercial labs (Huaron), and commercial laboratories off-site (La Colorada, El Peñon and Jacobina). All the assay data reported in this news release has been subjected to the industry standard quality assurance and quality control (“QA/QC”) program including the submission of certified standards, blanks, and duplicate samples. The results are reviewed on a monthly and quarterly basis by management. In general, the assay analytical technique for silver, lead, zinc and copper is acid digestion with either ICP or atomic absorption finish. The analytical technique for gold uses fire assay and atomic absorption spectrometry (AAS) finish. A gravimetric finish would be used if the gold assay exceeds > 10 g/t (or >5 g/t at El Peñon). The results of the QA/QC samples submitted for the resource databases demonstrate acceptable accuracy and precision. The offsite commercial laboratories are independent from Pan American and certified by ISO 17025:2017.

The Qualified Persons are of the opinion that the sample preparation, analytical, and security procedures followed for the samples are sufficient and reliable for the purpose of this news release and for the purpose of any future mineral resource and mineral reserve estimates. There were no limitations on the Qualified Persons’ verification process. Pan American is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data reported herein.

Mineral resources and mineral reserves are as defined by the Canadian Institute of Mining, Metallurgy and Petroleum.

Contacts

Siren Fisekci

VP, Investor Relations & Corporate Communications

Ph: 604-806-3191

Email: ir@panamericansilver.com

Read full story here

Alex

Recent Posts

VinFast officially delivers VF 5 electric cars in Indonesia

JAKARTA, INDONESIA - Media OutReach Newswire - 22 November 2024 - VinFast Auto has officially…

12 hours ago

AlphaX Makes Crypto Easier with Email Login and USDT Memecoins

SYDNEY, AUSTRALIA - Media OutReach Newswire - 22 November 2024 - The global cryptocurrency market…

12 hours ago

Vincom Retail: A Catalyst Driving Vietnam’s Retail Future

HANOI, VIETNAM – Media OutReach Newswire - 22 November 2024 - By capitalizing on its…

16 hours ago

How 5G Transforms Life: A Foreigner’s Journey Through East China’s Digital Revolution

HANGZHOU, CHINA - Media OutReach Newswire - 22 November 2024 - As the 2024 World…

17 hours ago

Explore Life for A Shared Future: 2024 Beijing Changping Forum on Life Science was successfully held

BEIJING, CHINA - Media OutReach Newswire - 22 November 2024 - The 2024 Beijing Changping…

17 hours ago