All amounts in US$ unless otherwise indicated
VANCOUVER, British Columbia–(BUSINESS WIRE)–Capstone Copper Corp. (“Capstone” or the “Company”) (TSX: CS) (ASX: CSC) today reported financial results for the three months and quarter ended March 31, 2024 (“Q1 2024”). Copper production in Q1 totaled 42,121 tonnes at C1 cash costs1 of $2.88 per payable pound of copper produced. Link HERE for Capstone’s Q1 2024 webcast presentation.
John MacKenzie, CEO of Capstone, commented, “Our mines got off to a solid start in the first quarter as we executed on our operating plans and delivered strong financial results. The copper market has entered into the early stages of a new era, and we are positioned extremely well as our flagship Mantoverde mine ramps up to full production. During the quarter, we advanced the feasibility studies that we plan to release by mid-year for our MV-Optimized brownfield expansion and our nearby Santo Domingo project, defining the next significant phases of our value-accretive production growth. Additionally, we are planning an exploration program focused on our highly prospective Mantoverde-Santo Domingo land package, that we believe will further demonstrate the world-class nature of the district.”
Q1 2024 OPERATIONAL AND FINANCIAL HIGHLIGHTS
1 These are Non-GAAP performance measures. Refer to the section titled “Non-GAAP and Other Performance Measures”. |
OPERATIONAL OVERVIEW
Refer to Capstone’s Q1 2024 MD&A and Financial Statements for detailed operating results.
| Q1 2024 | Q1 2023 |
Copper production (tonnes) |
|
|
Sulphide business |
|
|
Pinto Valley | 15,672 | 12,841 |
Cozamin | 6,006 | 5,239 |
Mantos Blancos | 9,163 | 10,847 |
Total sulphides | 30,841 | 28,927 |
Cathode business |
|
|
Mantos Blancos | 1,804 | 3,275 |
Mantoverde2 | 9,476 | 8,532 |
Total cathodes | 11,280 | 11,807 |
Consolidated | 42,121 | 40,734 |
Copper sales |
|
|
Copper sold (000s tonnes) | 40,996 | 37,456 |
Realized copper price1 ($/pound) | 3.85 | 4.17 |
C1 cash costs1 ($/pound) produced |
|
|
Sulphides business |
|
|
Pinto Valley | 2.53 | 3.09 |
Cozamin | 1.93 | 1.72 |
Mantos Blancos | 2.98 | 2.46 |
Total sulphides | 2.55 | 2.61 |
Cathode business |
|
|
Mantos Blancos | 3.43 | 3.36 |
Mantoverde | 3.82 | 4.02 |
Total cathodes | 3.76 | 3.83 |
Consolidated | 2.88 | 2.96 |
2 Mantoverde production shown on a 100% basis. |
Consolidated Production
Q1 2024 consolidated production of 42,121 tonnes of copper was 3% higher than 40,734 tonnes in Q1 2023, due to higher production at Pinto Valley and Cozamin mainly on higher grades, and at Mantoverde on higher grades and recoveries, partially offset by lower production at Mantos Blancos.
Q1 2024 C1 cash costs1 of $2.88/lb were 3% lower than $2.96/lb Q1 2023 on higher copper production along with lower main consumables prices and cost saving initiatives.
Pinto Valley Mine
Q1 2024 production was 22% higher than Q1 2023 due to significantly higher mill feed grade (0.36% in Q1 2024 versus 0.30% in Q1 2023) and higher recoveries (87.7% Q1 2024 versus 86.8% Q1 2023).
Q1 2024 C1 cash costs1 of $2.53/lb were 18% lower compared to the same period last year of $3.09/lb primarily due to higher production volume in the quarter ($0.56/lb) along with lower costs on grinding media and diesel from favorable pricing contracts executed in 2024 ($3.31/gal in Q1 2024 versus $3.70/gal in Q1 2023), lower property taxes and insurance costs, partially offset by increased mining costs due to spend on equipment maintenance and inflationary increases for electricity cost ($0.067/kWh in Q1 2024 versus $0.057/kWh in Q1 2023).
Mantos Blancos Mine
Q1 2024 production of 11.0 thousand tonnes, composed of 9.2 thousand tonnes from sulphide operations and 1.8 thousand tonnes of cathodes from oxide operations, was 22% lower than Q1 2023 on lower mill throughput (14,214 tpd in Q1 2024 versus 16,023 in Q1 2023) primarily due to a planned mill shutdown in February in order to prepare for installation of new equipment needed to achieve 20,000 tpd capacity and lower feed grades as a result of mine sequence (0.87% in Q1 2024 versus 0.94% in Q1 2023). To a lesser extent, the results were also impacted by unplanned maintenance. Cathode production in Q1 2024 was 45% lower than Q1 2023 due to lower throughput in line with the 2024 plan.
Combined Q1 2024 C1 cash costs1 of $3.05/lb ($2.98/lb sulphides and $3.43/lb cathodes) were 14% higher compared to $2.68/lb in Q1 2023 mainly due to lower production ($0.78/lb), partially offset by lower key consumable prices (-$0.15/lb), lower acid and energy consumption due to lower production (-$0.12/lb) and lower mine movements (-$0.14/lb). Realized sulphuric acid prices averaged $154/t in Q1 2024 versus $212/t in Q1 2023, energy prices averaged $0.10/kWh in Q1 2024 versus $0.11/kWh in Q1 2023, and diesel prices averaged $0.76/l in Q1 2024 versus $0.84/l in Q1 2023.
Mantoverde Mine
Q1 2024 production of 9.5 thousand tonnes was 11% higher than Q1 2023 due to higher heap grades as a result of mine sequence (0.36% in Q1 2024 versus 0.31% in Q1 2023) and higher recoveries (74.9% in Q1 2024 versus 69.0% in Q1 2023) due to higher solubility ratio of the processed mineral. Heap throughput in Q1 2024 was consistent with the same period last year. Dump production in Q1 2024 was 26% lower than Q1 2023 mainly on lower grades and recoveries due to mine sequence.
Q1 2024 C1 cash costs1 were $3.82/lb, 5% lower than $4.02/lb in Q1 2023 mainly related to higher production (-$0.40/lb) and lower main consumable prices (-$0.66/lb), which was partially offset by higher operational mine costs ($0.26/lb) and mine movement/stripping ($0.49/lb) due to change in mine sequence. Realized sulphuric acid prices averaged $145/t in Q1 2024 versus $177/t in Q1 2023, energy prices averaged $0.10/kWh in Q1 2024 versus $0.26/kWh in Q1 2023, and diesel prices averaged $0.74/l in Q1 2024 versus $0.83/l in Q1 2023. Energy costs significantly decreased as a result of a new long-term energy contract that commenced from January 1, 2024.
Cozamin Mine
Q1 2024 production was 15% higher than Q1 2023 due to higher grades (1.98% in Q1 2024 versus 1.77% in Q1 2023) consistent with the mine plan. Throughput and recoveries were consistent with the same period last year.
Q1 2024 C1 cash costs1 were 12% higher than the same period last year primarily due to the change in mining method which resulted in an increase in contractor utilization ($0.18/lb) and unfavourable foreign exchange rate ($0.10/lb), partially offset by more pounds payable produced and higher silver by-products credits.
Mantoverde Development Project
During Q1 2024, the Company advanced commissioning activities at the Mantoverde Development Project in Chile. The Company is focused on a safe, efficient and phased project commissioning and ramp-up. Notably, first ore was introduced to the grinding circuit (principally the SAG and Ball mills) during March, and the project remains on track for first saleable concentrate during Q2 2024.
MVDP is expected to enable the mine to process 236 million tonnes of copper sulphide reserves over a 20-year expected mine life, in addition to existing oxide reserves. The MVDP involves the addition of a sulphide concentrator (nominal 32,000 ore tonnes per day) and tailings storage facility, and the expansion of the existing desalination plant and other minor infrastructure.
MVDP is progressing under a lump-sum turn-key engineering, procurement, and construction (EPC) contract with Ausenco Limited, a multi-national EPC management company, with broad international experience in the design and construction of copper concentrator projects of this scale in the international market. The execution plan includes a Capstone Copper owner’s team working with Ausenco during the execution phase. The contract with Ausenco includes the project commissioning and ramp-up.
Key milestones during the commissioning and ramp-up include:
As of March 31, 2024, cash capital spent at MVDP totaled $823 million versus the project capital estimate of $870 million.
A virtual tour of MVDP can be viewed at https://vrify.com/decks/12698-mantoverde-development-project
MV Optimized Feasibility Study and Phase II
The Company is currently analyzing the next expansion of the sulphide concentrator and the optimization of the heap leach and solvent extraction facilities. Capstone has identified that the desalination plant capacity and major components of the comminution and flotation circuits of the MVDP can sustain an average annual throughput of approximately 45,000 tonnes per day. Capstone is working with Ausenco and Global Resource Engineering Ltd to develop the MV Optimized Feasibility Study, including evaluating the costs and timelines of debottlenecking the minor components of the plant to meet the potential increased throughput target. Completion of the optimized feasibility study is expected in the first half of 2024. The Company recently submitted an environmental DIA permit application for the MV Optimized project.
Given the above, the Mantoverde Phase II opportunity will evaluate the addition of an entire second processing line, possibly a duplication of the first line, to process some of the approximately 0.3 billion tonnes of Measured & Indicated and 0.6 billion tonnes of Inferred sulphide resources not in reserves.
Santo Domingo Feasibility Study Update
The Company has continued updating the Feasibility Study (“FS”) with contributions from international third parties, including Ausenco and Knight Piesold, and is progressing as planned towards releasing the updated FS in the first half of 2024. Santo Domingo is a fully permitted copper-iron-gold-cobalt project in the Atacama region of Chile, 35km northeast of Mantoverde. The updated FS will incorporate several improvements, including an updated mine plan with a lower strip ratio and modernized milling and flotation circuit with a lower overall footprint and operating cost compared with the previous design. The updated FS will also incorporate recently produced metallurgical testwork data and certain synergies in the Mantoverde – Santo Domingo district. One of the key improvements is the definition of an iron concentration circuit that can produce two different qualities of product: a bulk 65% grade iron concentrate and a premium 67% iron concentrate.
Mantoverde – Santo Domingo Cobalt Study
A district cobalt plant for Mantoverde – Santo Domingo may allow for low-cost by-product cobalt production while producing a by-product of sulphuric acid to be consumed internally to further significantly lower operating costs in the cathode process at Mantoverde.
The cobalt recovery process comprises a pyrite flotation step to recover cobaltiferous pyrite from MVDP tails and redirect it to the dynamic heap leach pads, which will be upgraded to a bio-leach configuration through the addition of an aeration system. The pyrite oxidizes in the leach pads and the solubilized cobalt is recovered via an ion exchange plant treating a bleed stream from the copper solvent extraction plant. The approach has been successfully demonstrated at the bench scale, and onsite piloting commenced in January 2024.
Engineering has commenced for a small plant treating only Mantoverde pyrite concentrates to produce up to 1,500 tonnes per annum (“tpa”) of contained cobalt. In line with this, Santo Domingo has started a study to assess, as part of the copper/iron circuit overall layout optimization being conducted by Ausenco, the optimum process configuration for the pyrite flotation and pumping transportation facilities needed to transport pyrite concentrate to Mantoverde’s leach facilities. This information will be part of the MV-SD cobalt study expected by the end of 2024.
At a combined MV-SD target of 4.5 to 6.0 thousand tpa of mined cobalt production, this would be one of the largest and lowest cost cobalt producers in the world, outside of Indonesia and the DRC.
PV District Growth Study
The company continues to review and evaluate the consolidation potential of the Pinto Valley district. Opportunities under evaluation include a potential mill expansion and increased leaching capacity supported by optimized water, heap and dump leach, and tailings infrastructure. District consolidation could unlock significant ESG opportunities and may transform our approach to create value for all stakeholders in the Globe-Miami District.
Management Additions
Effective February 20, 2024, David Taylor joined Capstone as Vice President, Health & Safety (“HSE”). Mr. Taylor brings with him 28 years of HSE experience in various sectors including mining, civil and mining infrastructure construction and engineering services and experience working in both Latin and North America. Over the course of his career, Mr. Taylor has worked at Stantec, Golder Associates, Stracon, Sierra Gorda SCM, and SNC Lavalin, amongst others.
Environmental, Social and Governance (“ESG”) Highlights
At Mantos Blancos, 100% of the 2023 electricity use was covered by renewable electricity certified sources. The Company is working towards transitioning to 50% renewable electricity in Chile by 2025, and more than 90% renewable electricity across Capstone by 2030.
Mantoverde and Mantos Blancos received ISO 50001 Energy Efficiency Management System certification.
Greenhouse gas emissions and Energy Management teams were formed at all sites to lead the development of operating level greenhouse gas emissions and energy reduction plans.
Corporate Exploration Update
Cozamin: Infill drilling at Mala Noche Main Vein West Target was conducted in Q1 2024 utilizing one underground rig positioned at the level 19.1 cross-cut. The initial mineral resource estimate for this target is planned for May 2024.
Copper Cities, Arizona: On January 20, 2022, Capstone Mining announced that it had entered into an 18-month access agreement with BHP Copper Inc. (“BHP”) to conduct drill and metallurgical test-work at BHP’s Copper Cities project (“Copper Cities”), located approximately 10 km east of the Pinto Valley mine. An amendment to the agreement was completed in March 2023 extending the term by another six months. A second amendment to the agreement now extends the term further to September 2024. Drilling with two surface rigs twinning historical drill holes was completed in 2022 with metallurgical testing continuing in 2024. As explained in the PV District Growth Study section, district consolidation opportunities are being evaluated.
Mantoverde, Santo Domingo, and Mantos Blancos, Chile: Infill drilling was conducted during Q1 2024 in both Mantoverde and Mantos Blancos pits. District exploration activities included the completion of rock geochemistry and additional surface mapping program north of Mantoverde district to support additional targeting for near-mine and resource expansion opportunities.
The Company envisions commencing in H2 2024 an initial two-year $25 million exploration program at Mantoverde which is planned to include over 61,500 metres of drilling. This program aims to: i) target higher copper grades; ii) explore new areas adjacent or inside the current Mantoverde pits with the potential to add new reserves and/or resources; and iii) test high priority targets in the northern area of the Mantoverde land package with the potential to support the MV-SD District.
2024 Guidance
The Company reiterates its 2024 consolidated production, C1 cash costs1, and capital expenditures (including capitalized stripping) guidance of 190-220kt of copper, $2.30 to $2.50 per payable pound and $455 million, respectively. The Company also reiterates the first half (H1) and second half (H2) production and cost guidance ranges announced on January 24, 2024. We expect production to be back-half weighted, with sequential quarter-over-quarter improvements in copper production, driven largely by the ramp-up at the Mantoverde Development Project.
MVDP remains on track and on budget, with first saleable concentrate expected in Q2 2024 and the achievement of nameplate operating rates expected during Q3 2024.
FINANCIAL OVERVIEW
Please refer to Capstone’s Q1 2024 MD&A and Financial Statements for detailed financial results.
($ millions, except per share data) | Q1 2024 | Q1 2023 | ||
Revenue | 339.9 |
| 335.6 |
|
|
|
| ||
Net loss | (5.8 | ) | (29.0 | ) |
|
|
| ||
Net loss attributable to shareholders | (4.8 | ) | (20.0 | ) |
Net loss attributable to shareholders per common share – basic and diluted ($) | (0.01 | ) | (0.03 | ) |
|
|
| ||
Adjusted net (loss) income1 | (4.5 | ) | 17.5 |
|
Adjusted net (loss) income attributable to shareholders per common share – basic and diluted | (0.01 | ) | 0.03 |
|
|
|
| ||
Operating cash flow before changes in working capital | 62.1 |
| 41.7 |
|
|
|
| ||
Adjusted EBITDA1 | 80.1 |
| 66.0 |
|
|
|
| ||
Realized copper price1 ($/pound) | 3.85 |
| 4.17 |
|
($ millions) | March 31, 2024 | December 31, 2023 | ||
Net debt1 | (740.2 | ) | (927.2 | ) |
Attributable net (debt)/cash1 | (590.8 | ) | (776.6 | ) |
CONFERENCE CALL AND WEBCAST DETAILS
Capstone will host a conference call and webcast on Thursday, May 2 at 5:00 pm Eastern Time / 2:00 pm Pacific Time (Friday, May 3, 2024, 7:00 am Australian Eastern Standard Time). Link to the audio webcast: https://app.webinar.net/yE97V7pezQr
Dial-in numbers for the audio-only portion of the conference call are below. Due to an increase in call volume, please dial-in at least five minutes prior to the call to ensure placement into the conference line on time.
Toronto: 416-764-8650
Vancouver: 778-383-7413
Australia: 613-627-2402
North America toll free: 888-664-6383
A replay of the conference call will be available until May 9, 2024. Dial-in numbers for Toronto: (+1) 416-764-8677 and North American toll free: 888-390-0541. The replay code is 176405#. Following the replay, an audio file will be available on Capstone’s website at https://capstonecopper.com/investors/events-and-presentations/.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
This document may contain “forward-looking information” within the meaning of Canadian securities legislation and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking statements”). These forward-looking statements are made as of the date of this document and the Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required under applicable securities legislation.
Forward-looking statements relate to future events or future performance and reflect our expectations or beliefs regarding future events. Our Sustainable Development Strategy goals and strategies are based on a number of assumptions, including, but not limited to, the biodiversity and climate-change consequences; availability and effectiveness of technologies needed to achieve our sustainability goals and priorities; availability of land or other opportunities for conservation, rehabilitation or capacity building on commercially reasonable terms and our ability to obtain any required external approvals or consensus for such opportunities; the availability of clean energy sources and zero-emissions alternatives for transportation on reasonable terms; availability of resources to achieve the goals in a timely manner, our ability to successfully implement new technology; and the performance of new technologies in accordance with our expectations.
Forward-looking statements include, but are not limited to, statements with respect to the estimation of Mineral Resources and Mineral Reserves, the success of the underground paste backfill and tailings filtration projects at Cozamin, the timing and cost of the Mantoverde Development Project (“MVDP”), the timing and results
Contacts
Jerrold Annett, SVP, Strategy and Capital Markets
647-273-7351
jannett@capstonecopper.com
Daniel Sampieri, Director, Investor Relations & Strategic Analysis
437-788-1767
dsampieri@capstonecopper.com
JAKARTA, INDONESIA - Media OutReach Newswire - 22 November 2024 - VinFast Auto has officially…
SYDNEY, AUSTRALIA - Media OutReach Newswire - 22 November 2024 - The global cryptocurrency market…
HANOI, VIETNAM – Media OutReach Newswire - 22 November 2024 - By capitalizing on its…
HANGZHOU, CHINA - Media OutReach Newswire - 22 November 2024 - As the 2024 World…
BEIJING, CHINA - Media OutReach Newswire - 22 November 2024 - The 2024 Beijing Changping…
Tickets Now Available via Urbtix HONG KONG SAR - Media OutReach Newswire - 22 November…