CASA GRANDE, Ariz. & TORONTO–(BUSINESS WIRE)–$ASCU #Arizona—Arizona Sonoran Copper Company Inc. (TSX:ASCU | OTCQX:ASCUF) (�ASCU or the Company), an emerging copper developer and near-term producer, today announces 6 infill holes from the Parks/Salyer Pre-Feasibility Study (PFS) level drilling program. The infill to Indicated drilling program was completed on time and within the budget, with the remaining assays from 10 drill holes expected by the middle of May. This program will be used to generate an updated resource model and mine plan to support the declaration of first reserves in the pending PFS by Q1 2024. As announced March 6, 2023, the PFS is exploring an integrated operation for Parks/Salyer and Cactus targeting 50 ktpa production (see FIGURES 1-11).
PFS-level drilling at Parks/Salyer included geotechnical (HQ), hydrological (HQ) and metallurgical (PQ) holes, in addition to the infill drilling (HQ). Having completed the programs, the three drill rigs are now focused on the following drilling programs:
Drilling Highlights:
NOTE: True widths are not known
Doug Bowden, Arizona Sonoran VP Exploration commented, As we complete drill programs to finalize an indicated resource estimate (PFS), support engineering and mine planning, we note the drilling is performing as planned, and in instances, with better than expected grade thicknesses. Parks/Salyer intercepts indicate a continuous deposit with typically 100-300 meter enrichment thicknesses that could potentially support a bulk mining scenario. Infill drilling has continued to expand the high-grade core at Parks/Salyer within the inferred resource area defined by the original 500 ft (152 m) drill pattern.
Drilling Recap
A total of three metallurgical holes (PQ 3.345 inch diameter) were completed to provide material for the column leach testing taking place onsite at the TruStone Facility. The columns are now 90 and 120 days complete, and preliminary results are expected shortly. Two metallurgical holes, along with one HQ (2.5 inch diameter) drill hole, were converted to hydrology monitoring holes. A total of five oriented core and geotechnical holes are being surveyed for fracture and directional analysis ahead of mine planning; via Acoustic Tele-viewer survey.
The infill to indicated drilling program was planned to infill to 250 ft (76 m) drill centers, extending through the leachable oxides and enriched mineralization, or secondary sulphides, for inclusion as our base case mine plan. To ensure a complete view of the deposit, for ASCU records and as it relates to the Nuton sulphide leaching technologies, ASCU also drilled through the primary sulphides to the basement fault at Parks/Salyer defining a deposit that extends 2,900 ft (884 m) by 2,200 ft (670 m), at the south-western end of the 4 km mine trend.
Infill drilling on the west side of the Parks/Salyer deposit (FIGURE 1) continues to define the westward continuation of thick, higher-grade, enriched and primary mineralization (ECP-126 and ECP-131). Drill holes ECP-134, ECP-133 and ECP-127 demonstrate continuation of the enrichment blanket to the west, albeit with thinner, stacked layers of copper mineralization that have suffered leaching near the faults that define the edge of the orebody. Drill holes ECP-127, ECP-130 and ECP-133 show a similar definition of the enrichment blanket. A NS cross section through the area demonstrates the continuity of the enrichment zone on the western edge of Parks/Salyer and the effect of late oxidation on the enrichment blanket in the area of ECP-130.
The dacite dyke shown in the cross section is similar in width and continuity to dacite dykes seen in Cactus West on the southern edge of that orebody. These dykes are very late stage relative to the mineralizing event and acted as dams to the enrichment process, with very good enrichment and oxide grades ponding above them, as shown in ECP-131.
There are many occurrences of native copper around the deposit. While native copper does not represent a significant contribution to the oxide resource, it does indicate directional flow of the secondary copper fluids, sometimes pointing toward ponded enrichment areas as shown in ECP-131. The team is currently mapping instances of both native copper and cuprite as they typically exist within close proximity of each other.
ASCU drilling has defined the edge of a potassic zone associated with lower grades in the primary mineralization in the northwest quadrant of the orebody. Higher primary grades are commonly associated with zones of phyllic alteration (commonly as an overprint), which at Parks/Salyer follows the general mine trend NE orientation. This phyllic zone represents the larger area of thicker, higher grades shown in FIGURE 2.
TABLE 1: Parks/Salyer Drilling Highlights
Hole Id | Zone | Feet | Metres | CuT % | TSol % | Mo % | ||||
From | To | Length | From | To | Length | |||||
ECP-126 | oxide | 683.0 | 729.4 | 46.4 | 208.2 | 222.3 | 14.1 | 0.72 | 0.62 | 0.002 |
enriched | 782.2 | 1076.5 | 294.3 | 238.4 | 328.1 | 89.7 | 0.85 | 0.82 | 0.006 | |
including | 792.0 | 852.2 | 60.2 | 241.4 | 259.8 | 18.3 | 1.27 | 1.23 | 0.004 | |
and | 1015.0 | 1076.5 | 61.5 | 309.4 | 328.1 | 18.7 | 1.52 | 1.46 | 0.008 | |
enriched | 1178.6 | 1418.0 | 239.4 | 359.2 | 432.2 | 73.0 | 1.38 | 1.03 | 0.031 | |
including | 1188.0 | 1268.0 | 80.0 | 362.1 | 386.5 | 24.4 | 2.60 | 2.39 | 0.017 | |
primary | 1418.0 | 2137.0 | 719.0 | 432.2 | 651.4 | 219.2 | 0.52 | 0.04 | 0.017 | |
including | 1500.0 | 1550.0 | 50.0 | 457.2 | 472.4 | 15.2 | 0.74 | 0.06 | 0.048 | |
and | 2020.7 | 2069.0 | 48.3 | 615.9 | 630.6 | 14.7 | 0.73 | 0.05 | 0.011 | |
ECP-127 | oxide | 1044.0 | 1064.0 | 20.0 | 318.2 | 324.3 | 6.1 | 3.11 | 3.08 | 0.009 |
oxide | 1103.3 | 1133.2 | 29.9 | 336.3 | 345.4 | 9.1 | 0.82 | 0.81 | 0.012 | |
enriched | 1246.2 | 1802.0 | 555.8 | 379.8 | 549.2 | 169.4 | 0.80 | 0.76 | 0.008 | |
including | 1246.2 | 1266.0 | 19.8 | 379.8 | 385.9 | 6.0 | 2.49 | 2.48 | 0.011 | |
and | 1351.3 | 1404.0 | 52.7 | 411.9 | 427.9 | 16.1 | 1.28 | 1.25 | 0.005 | |
and | 1434.0 | 1484.0 | 50.0 | 437.1 | 452.3 | 15.2 | 1.22 | 1.19 | 0.018 | |
and | 1554.0 | 1584.0 | 30.0 | 473.7 | 482.8 | 9.1 | 1.74 | 1.73 | 0.012 | |
primary | 1802.0 | 2320.4 | 518.4 | 549.2 | 707.3 | 158.0 | 0.29 | 0.03 | 0.010 | |
including | 1865.0 | 2040.0 | 175.0 | 568.5 | 621.8 | 53.3 | 0.59 | 0.06 | 0.013 | |
ECP-130 | oxide | 976.3 | 1089.0 | 112.7 | 297.6 | 331.9 | 34.4 | 0.63 | 0.62 | 0.020 |
oxide | 1143.6 | 1307.0 | 163.4 | 348.6 | 398.4 | 49.8 | 0.68 | 0.67 | 0.022 | |
including | 1143.6 | 1173.3 | 29.7 | 348.6 | 357.6 | 9.1 | 1.18 | 1.17 | 0.042 | |
and | 1275.6 | 1307.0 | 31.4 | 388.8 | 398.4 | 9.6 | 1.11 | 1.11 | 0.030 | |
enriched | 1332.5 | 1495.0 | 162.5 | 406.1 | 455.7 | 49.5 | 1.06 | 0.98 | 0.034 | |
including | 1337.0 | 1353.0 | 16.0 | 407.5 | 412.4 | 4.9 | 3.76 | 3.72 | 0.031 | |
enriched | 1640.0 | 1700.0 | 60.0 | 499.9 | 518.2 | 18.3 | 0.88 | 0.86 | 0.025 | |
primary | 1778.0 | 2327.0 | 549.0 | 541.9 | 709.3 | 167.3 | 0.17 | 0.02 | 0.006 | |
ECP-131 | enriched | 1011.0 | 1488.0 | 477.0 | 308.2 | 453.5 | 145.4 | 1.25 | 1.15 | 0.018 |
including | 1011.0 | 1078.0 | 67.0 | 308.2 | 328.6 | 20.4 | 2.24 | 2.19 | 0.009 | |
and | 1128.0 | 1158.0 | 30.0 | 343.8 | 353.0 | 9.1 | 1.95 | 1.88 | 0.018 | |
and | 1394.6 | 1428.0 | 33.4 | 425.1 | 435.3 | 10.2 | 2.20 | 2.09 | 0.027 | |
primary | 1488.0 | 2220.7 | 732.7 | 453.5 | 676.9 | 223.3 | 0.34 | 0.04 | 0.009 | |
including | 1508.0 | 1588.0 | 80.0 | 459.6 | 484.0 | 24.4 | 0.49 | 0.07 | 0.023 | |
and | 1879.1 | 2050.4 | 171.3 | 572.7 | 625.0 | 52.2 | 0.51 | 0.03 | 0.011 | |
and | 2170.0 | 2220.7 | 50.7 | 661.4 | 676.9 | 15.5 | 0.51 | 0.03 | 0.004 | |
ECP-133 | oxide | 1057.8 | 1127.6 | 69.8 | 322.4 | 343.7 | 21.3 | 0.92 | 0.91 | 0.004 |
enriched | 1194.5 | 1905.0 | 710.5 | 364.1 | 580.6 | 216.6 | 0.55 | 0.47 | 0.006 | |
including | 1194.5 | 1354.0 | 159.5 | 364.1 | 412.7 | 48.6 | 1.19 | 1.01 | 0.007 | |
and | 1577.0 | 1617.0 | 40.0 | 480.7 | 492.9 | 12.2 | 0.62 | 0.44 | 0.010 | |
and | 1793.0 | 1855.0 | 62.0 | 546.5 | 565.4 | 18.9 | 0.66 | 0.63 | 0.007 | |
primary | 1905.0 | 2227.0 | 322.0 | 580.6 | 678.8 | 98.1 | 0.15 | 0.02 | 0.011 | |
ECP-134 | enriched | 902.4 | 952.0 | 49.6 | 275.1 | 290.2 | 15.1 | 1.14 | 1.09 | 0.018 |
enriched | 1066.0 | 1136.0 | 70.0 | 324.9 | 346.3 | 21.3 | 0.56 | 0.52 | 0.022 | |
enriched | 1428.0 | 1568.0 | 140.0 | 435.3 | 477.9 | 42.7 | 1.48 | 1.45 | 0.012 | |
including | 1428.0 | 1498.0 | 70.0 | 435.3 | 456.6 | 21.3 | 1.83 | 1.79 | 0.010 |
Table 2: Drilling details
Hole | Easting (m) | Northing (m) | Elevation (ft) | TD (ft) | Azimuth | Dip |
ECP-126 | 421605.7 | 3644813.5 | 1365.0 | 2151.6 | 0.0 | -90.0 |
ECP-127 | 421531.7 | 3645200.7 | 1377.7 | 2427.0 | 0.0 | -90.0 |
ECP-130 | 421601.0 | 3645160.2 | 1377.9 | 2367.7 | 0.0 | -90.0 |
ECP-131 | 421609.8 | 3644893.6 | 1370.8 | 2268.2 | 0.0 | -90.0 |
ECP-133 | 421465.0 | 3645139.8 | 1375.8 | 2417.0 | 0.0 | -90.0 |
ECP-134 | 421529.5 | 3644850.9 | 1368.2 | 2248.0 | 0.0 | -90.0 |
Quality Assurance / Quality Control
Drilling completed on the project between 2020 and 2022 was supervised by on-site ASCU personnel who prepared core samples for assay and implemented a full QA/QC program using blanks, standards, and duplicates to monitor analytical accuracy and precision. The samples were sealed on site and shipped to Skyline Laboratories in Tucson AZ for analysis. Skylines quality control system complies with global certifications for Quality ISO9001:2008.
Technical aspects of this news release have been reviewed and verified by Allan Schappert CPG #11758, who is a qualified person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects.
Links from the Press Release
Figures 1-11: https://arizonasonoran.com/projects/exploration/maps-and-figures/
Neither the TSX nor the regulating authority has approved or disproved the information contained in this press release.
About Arizona Sonoran Copper Company (www.arizonasonoran.com | www.cactusmine.com)
ASCUs objective is to become a mid-tier copper producer with low operating costs and to develop the Cactus and Parks/Salyer Projects that could generate robust returns for investors and provide a long term sustainable and responsible operation for the community and all stakeholders. The Company’s principal asset is a 100% interest in the Cactus Project (former ASARCO, Sacaton mine) which is situated on private land in an infrastructure-rich area of Arizona. Contiguous to the Cactus Project is the Companys 100%-owned Parks/Salyer deposit that could allow for a phased expansion of the Cactus Mine once it becomes a producing asset. The Company is led by an executive management team and Board which have a long-standing track record of successful project delivery in North America complemented by global capital markets expertise.
Forward-Looking Statements
Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of ASCU to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Factors that could affect the outcome include, among others: future prices and the supply of metals; the results of drilling; inability to raise the money necessary to incur the expenditures required to retain and advance the properties; environmental liabilities (known and unknown); general business, economic, competitive, political and social uncertainties; results of exploration programs; accidents, labour disputes and other risks of the mining industry; political instability, terrorism, insurrection or war; or delays in obtaining governmental approvals, projected cash operating costs, failure to obtain regulatory or shareholder approvals.
Although ASCU has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of this news release and ASCU disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws.
Contacts
Alison Dwoskin, Director, Investor Relations
647-233-4348
adwoskin@arizonasonoran.com
George Ogilvie, President, CEO and Director
416-723-0458
gogilvie@arizonasonoran.com
BEIJING, CHINA - Media OutReach Newswire - 8 November 2024 - Since its inception more…
Acquisition Expands TBS’ Regional Waste Management Platform in Indonesia and Singapore, aligning with its TBS2030…
KUALA LUMPUR, MALAYSIA - Media OutReach Newswire - 8 November 2024 - It’s that time…
BARCELONA, SPAIN - Media OutReach Newswire - 8 November 2024 - On November 6, Central…
SINGAPORE - Media OutReach Newswire - 8 November 2024 - Singapore is strengthening its position…
PARIS, FRANCE - Media OutReach Newswire – 8 November 2024 - This year, OPPO once…